0

Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants

  • Author(s)/Editor(s):
  • Published:
    2017
  • DOI:
    10.1115/1.861264
Description | Details

Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in adequately considering and planning for the many major activities involved in the design, construction and start-up of cogeneration and combined cycle power plants. Experience has shown that failure to consider the complex interrelationships between the various component systems can result in costly delays in project completion and turn over dates. Additionally, incorrect procedures and planning can result in damage or failure of key pieces of equipment or systems during subsequent operation.

  • Copyright:
    All rights reserved. Printed in the United States of America. Except as permitted under the United States Copyright Act of 1976, no part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without the prior written permission of the publisher. ©  2017  ASME
  • ISBN:
    9780791861264
  • No. of Pages:
    100
  • Order No.:
    861264

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In