0
Chapter 2
Pipeline Route Selection, Survey, and Geotechnical Guidelines

Excerpt

A pipeline system survey is sanctioned prior to construction to obtain a complete and comprehensive record of all physical aspects associated with the system. To design and construct a pipeline project the following survey activities are required:

• Preliminary route selection

• Engineering survey

• Legal survey

• Construction survey

• As-built survey

  • Introduction
  • Preliminary Route Selection
  • Key Factors for Route Selection
  • Engineering Survey
  • Legal Survey
  • Construction∕As-Built Survey
  • Geotechnical Design
  • References
Topics: Pipelines

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In