0
Multi-Objective Optimization of Power Plant Maintenance Projects Based on NSGA-II

Excerpt

Reducing power plant maintenance costs is an important way to improve the power enterprises production efficiency, for the current situation that maintenance assessment index is too single and the problem of high complexity is difficult to solve by common maintenance optimization methods, power plant multi-objective maintenance projects optimization model is established and solved by a method of fast-non-dominated-sorting genetic algorithm with elitist strategy (NSGA-II) in this paper. This method overcomes the previous problem of single optimizing assessment index and improves the efficiency and robustness of the problem solving efficiency. By the case study of a 300MW power unit electric feed pump overhaul, it is proved that the establishment and solvent of this model is effective and feasible.

  • Abstract
  • Key Words
  • 1. Introduction
  • 2. Multi-Objective Optimization Model of Power Plant Maintenance Projects
  • 3. Multi-Objective Optimization of Power Plant Maintenance Projects Based on NSGA-II
  • 4. Case Study
  • 5. Conclusion
  • References

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In